Joe schmoe
Well-Known Member
- Thread starter
- #1
The entire history and checkins for the Memphis EA station (the only fast CCS in the entire city) has been memory holed. The station has been completely off line for several months, and had been the object of a lot of criticism.
Looking at other EA stations in the region, checkins are still mostly there, including negative ones, but some seem to be missing. I left a non favorable review for the Jackson, TN EA station in late July which I can't find, but a semi positive one (135kw on a 350kw cabinet) I left in March is still there.
It's possible that I failed to hit the button and post the review in July, I hadn't checked back to see if it was there until today. However, I try to checkin in every single time I charge, as I think accurate information (good, bad, or ugly) is critical with the sparse and unreliable infrastructure that we have.
I'm 100% certain that there were dozens of uniformly negative reviews on the Memphis EA station which now seem to be missing.
I'm troubled by the appearance that EA or Plugshare may be "filtering" unfavorable reviews.
Looking at other EA stations in the region, checkins are still mostly there, including negative ones, but some seem to be missing. I left a non favorable review for the Jackson, TN EA station in late July which I can't find, but a semi positive one (135kw on a 350kw cabinet) I left in March is still there.
It's possible that I failed to hit the button and post the review in July, I hadn't checked back to see if it was there until today. However, I try to checkin in every single time I charge, as I think accurate information (good, bad, or ugly) is critical with the sparse and unreliable infrastructure that we have.
I'm 100% certain that there were dozens of uniformly negative reviews on the Memphis EA station which now seem to be missing.
I'm troubled by the appearance that EA or Plugshare may be "filtering" unfavorable reviews.
Sponsored
Last edited: