Gerolsteiner
Active Member
Emotional rollercoaster but I’m okay with this.
I took delivery a year ago and I’ve had a fantastic experience and got the early bird discount. By the time I’ll even consider replacing it, it’ll hopefully be time for Gen 3 with a real sound system and 800V architecture to ship.
I took delivery a year ago and I’ve had a fantastic experience and got the early bird discount. By the time I’ll even consider replacing it, it’ll hopefully be time for Gen 3 with a real sound system and 800V architecture to ship.
Sponsored