I went by Bozeman today. Transformer was installed, lighting setup, asphalt painted, posts in place, and no Rivian equipment. Hopefully it’s in that box truck in the picture.
PDF Format below:
Groveland, CA RAN as of ~2 weeks ago!Highly doubtful considering this photo was taken yesterday (https://www.plugshare.com/location/516379):
...and you mean Yosemite, right?
![]()
My brother in Christ: you pointed out every EV except for the beautiful Canyon Red R1S right in front of you.Groveland, CA RAN as of ~2 weeks ago!
Any updates on this one?Here's the permit and site plan information for the Kittery, Maine RAN site. I hear construction could start very soon. @TeamEV
Address: 301 US-1 One, Kittery, ME 03904
Building permit BP-22-357 issued 9/23/2023
![]()
![]()
According to check-ins on plug share, all work appears to be completed and the screens are on indicating “coming soon… we are settings up”. (Yes, rivian has the grammatical error on their screens)Any updates on this one?
That means no less than 150kW a charging dispenser!Three power cabinets for 6 chargers, the posts weren’t labeled yet, but should be pairs rather than trios.
Thanks. Saw a YouTube video of the site with none in use, but an R1T charging at another free charger.According to check-ins on plug share, all work appears to be completed and the screens are on indicating “coming soon… we are settings up”. (Yes, rivian has the grammatical error on their screens)
Been that way for a couple of weeks now. Really hoping this gets turned on soon as I have a trip coming where we plan on stopping at the trading post. Would be great to get some juice while we’re there!