Craigins
Well-Known Member
- Joined
- Jun 10, 2021
- Threads
- 2
- Messages
- 1,571
- Reaction score
- 2,397
- Location
- Chicago Suburbs
- Vehicles
- Rivian R1T
- Occupation
- Software engineer
And you think the current transmission grid has the excess capacity to support additional 2.1 MW loads every 50 miles down interstates?Any charger which meets HPC-350 must be able to deliver up to 920V. This includes the EA 350kW chargers currently out there.
Sponsored