Pardon my ignorance, but what does "EP" stand for?Here are some locations I know of for charger locations that are pending jobs.
![]()
Hey Burner, is this list on the forum? I’d be interested to see if any are planned for Oregon.Here are some locations I know of for charger locations that are pending jobs.
![]()
Thanks. I saw the Rivian Forums watermark and assumed there was a file somewhere showing all current EP openings.This is a new list most likely.
Maybe I worded the post incorrectly. These aren't job openings but rather job locations for charging stations from the Utility side where a planning engineer for the utility would determine if they are suitable to connect or if the grid needs work to accommodate the load.Thanks. I saw the Rivian Forums watermark and assumed there was a file somewhere showing all current EP openings.
Looks like that area would be Southern California Edison territory, right? If so, you'd need a source at SCE. This list is is probably from PG&E.Looks like Yosemite will be covered, now we need Sequoia and Kings Canyon. Without a charger somewhere in the park, the trip to Cedar Grove will be rough.