Announcing our new "CLUBS" section where you can join or create a Rivian club or group! You can use this new feature to conveniently plan and discuss local events, gatherings or other club/group related topics.
So we encourage you to join (or start) special-interest and regional-based Rivian clubs at: https://www.rivianforums.com/forum/group-categories/clubs-groups.1/
Pardon my ignorance, but what does "EP" stand for?Here are some locations I know of for charger locations that are pending jobs.
Hey Burner, is this list on the forum? I’d be interested to see if any are planned for Oregon.Here are some locations I know of for charger locations that are pending jobs.
Thanks. I saw the Rivian Forums watermark and assumed there was a file somewhere showing all current EP openings.This is a new list most likely.
Maybe I worded the post incorrectly. These aren't job openings but rather job locations for charging stations from the Utility side where a planning engineer for the utility would determine if they are suitable to connect or if the grid needs work to accommodate the load.Thanks. I saw the Rivian Forums watermark and assumed there was a file somewhere showing all current EP openings.
Looks like that area would be Southern California Edison territory, right? If so, you'd need a source at SCE. This list is is probably from PG&E.Looks like Yosemite will be covered, now we need Sequoia and Kings Canyon. Without a charger somewhere in the park, the trip to Cedar Grove will be rough.