I've driven from Detroit to Memphis, and from Memphis to the Florida panhandle. In the Rivian, less than 1/4 of the 350kw chargers on that route were fully functional. Most were completely dead, two were throttled severely (less than 60 kw).I got 250kW plus every time I charged my Hummer EV at an EA station on our trip from Detroit to South Florida and back, so no, I wouldn't be surprised. That was before GM bumped up the charge rate on them. 22-25 minutes to put in 90 kWh. We had to skip one station on that trip because two were down and the other two were occupied. It was not a big deal at all because the size of the battery trivialized needing to.