JeffADK
Well-Known Member
- First Name
- Jeff
- Joined
- Mar 29, 2019
- Threads
- 5
- Messages
- 87
- Reaction score
- 113
- Location
- Upstate NY
- Vehicles
- R1T, Convertible, Tractor, UTV
- Occupation
- All the time
Several years ago I planned to pursue your latter option because my new garage was located next to the transformer pole, but found out that having the service entrance on my detached garage would cause the entire service to be metered as a commercial rather than residential service according to the tariffs in effect at that time where I live. I ended up with the meter on the garage, running the feed underground to the house to the main panel, then running a 60A circuit back to the garage to a sub-panel. I wasn't happy about the extra conduit and copper, but I got rid of the aerial service and got the meter off the side of the house.My ca. 1960 house has 100A service, and a full panel.
New garage will be built before rivian arrives. it will either get separate 200A service or I’ll move the service entrance to the garage, upgrade my service, and feed the house from there.
Sponsored